Burbeck House, Fleet

COMPLETED FEBRUARY 2022

This site was purchased with planning approval which was subsequently redesigned for modern open plan family living. This impressive five bedroom detached house with triple garage has an 85m private drive taking you to this secluded development in Fleet’s blue triangle.

1 Cold Harbour Lane, Farnborough

COMPLETED – August 2022

An option was taken with the land owner following negotiations with the planning department, planning was granted for a three bedroom detached house with parking.

29 & 30 Mercer Close, Basingstoke

COMPLETED OCTOBER 2022

These two four bedroom detached houses have been built to a very high standard. They feature a stylish open plan kitchen / diner circa 25ft with bi-folding doors to rear garden, plus a separate utility, living room, four good sized bedrooms with en suite to master.  Ample off road parking and good sized integral garage.


Sandringham Gardens, Farnborough

Completed

This exciting new family home development was completed in the Summer of 2017 and was favourably received in the open market with the final sale concluding in September 2017.To facilitate this development three existing bungalows were demolished and sections of three rear gardens from adjoining neighbours acquired. Original permission granted for phase one was for 12 new units with approval for phase two following on for a further four bed detached.More land required for this type of development.

Rosewarne Gardens Surrey GU16 6DU

Completed

A prestigious development of family housing offering spectacular accommodation with superbly fitted kitchens offering full height fridge, freezer and double oven with open plan kitchen/dining/family area with aluminium bifold doors leading to garden. All master bedrooms with ensuite. Mechanical ventilation heat recovery to all rooms giving fresh air throughout the property rather than the old fashioned electric extracts. All properties connected to BT through their superfast fibre broadband network. Minimum of two parking spaces per property.

Completion 2020.

The Oaks, Avenue Road, Farnborough

Completed

Both properties were sold within weeks of going to the market.
Discussions with the owner regarding the redevelopment of their garden initially took place in 2007. They subsequently declined our proposal and decided to employ their own professionals to submit a planning application on their behalf, unfortunately this was unsuccessful. The owner contacted us again in June 2010 and an option was signed in July 2010 and following consultation with the planning department, arboriculture officer and surrounding neighbours a formal planning application was submitted in the Spring of 2012 and approved in July 2012. In our appraisal we felt it was important to retain the existing property and the new properties should reflect the character of the surrounding residential properties. Planning was achieved for two 5 bed detached houses with double garages.

Harwood House, Fleet (Within the Blue Triangle)

Completed

Discussions with the owner initially took place in 2006 regarding the possible development of their side garden. They subsequently declined our proposal and decided to appoint an alternative developer to submit a planning application on their behalf, unfortunately they were unsuccessful. The owner contacted us again in 2011 and an option was subsequently signed. Following consultation with the planning department, arboriculture officer and surrounding neighbours a formal planning application was submitted and approved late December 2012. In our appraisal we felt it was important to match the character of the surrounding properties and felt it was important not to over develop the site. Planning was achieved for one 6 bed detached house with detached double garage.

Completion June 2016.

Hollydene, Upper Street, Fleet

Completed

5 x 2 bed apartments and 2 x 1 bed apartment with lift and dedicated parking. Situated in Fleet town centre close to shops and mainline railway, Waterloo being 35 mins.

Completion May 2021.

Vinehurst, St James Road, Fleet

Completed

2 x 4 bed houses, 1 x 3 bed house, 1 x 2 bed house and 1 x 1 bed flat, 1 x 3 bed house, 1 x 2 bed house and 1 x 1 bed flat.

Completion 2019.

Kensington Place

Completed

We were initially in discussions with the local authority to carry out a complete redevelopment of 109-122 Victoria Road with some 55 units comprising one and two bedroom flats along with three and four bedroom houses.  Unfortunately due to the increase in the Unilateral 106 payments to the local authority this made our proposed scheme financially unviable.  With this in mind we reverted to a smaller scheme utilising the land to the rear of the properties, planning was granted for five three bedroom town houses and associated parking.

Heathlands Close (Land to rear of 79-83 Fernhill Road, Farnborough)

Completed

Open Day held 11th May 2013 and both properties went under offer with the last one completing on 7thJuly 2013. An option was taken with 83 Fernhill Road also covering the gardens of 79&81.  The original planning was for one 3 bed bungalow, but after various consultations with the local community we have achieved permission for one 3 bed & one 4 bed link detached houses. The initial option was taken in December 2007 and work commenced in October 2012.

10 Woodlands Road, Farnborough

Completed

Planning was granted for a mixture of five family houses in this quiet, sought after family location in Farnborough. This development involved a rear garden, parking area and a builders yard.

70-74 Cherrywood Road, Farnborough

Completed

This development of one 2-bed semi-detatched house and one 1-bed detached house was pulled together from two large gardens. Since commencing work on this site we took another option with the adjoining neighbour to redevelop their rear garden and gained planning permission to build a 3 bed detached house.

94-96 Cherrywood Road, Farnborough

Completed

Using the rear garden of one property we developed two 3 bed semi-detached houses.

Completion: May 2011

Towerhill, Farnborough

Completed

A beautiful new development of four 3 bed semi-detached houses and one 4 bedroom detached house. These were built on land acquired with an existing property which was demolished.

54a College Road, College Town, Sandhurst

Completed

1 x four bed detached family house.

17 Severn Road, Farnborough

Completed

1 x three bed detached family house.